How to operate the hydraulic water well drilling rig correctly? water well drilling rig

Publication Date: Mar 11, 2023
07.jpg

1. After the preparation is completed, connect the drill bit. Operate the chassis gear control handle to make the top gear run, and then engage a suitable high-speed gear to drive the high-power generator to work.


2. Adjust the operation keys and buttons on the panel of the power generation control device so that the rated voltage of the generator is about 400V when it is turned to the "automatic" position (at this time, the engine speed is stable at about 1000 rpm), ready for drilling operations.

3. The operator is in place, and the operator presses the signboard of the circuit control box (as shown in the figure below) to prompt, and turns on the mud pump motor switch and the main drive motor switch to start the mud pump and the main drive.

4. Turn the handle of the transfer case to the marks of "turntable forward" and "winch slowly".

5. Slowly release the brake handle of the main winch, put down the drilling tool and drill.

6. During the drilling process, try to keep the feed evenly. After drilling a drill pipe, do not lift the drill and let the mud circulate in the hole for a few minutes to ensure that the drilling cuttings in the hole are completely returned. Then lift the drill slowly and install the drill pipe.

7. Drilling down again, before the drill bit reaches the bottom of the hole, start the pump to flush, wait for the mud to return to normal from the hole, and then drill.

8. After the drilling is completed, lift the drill and drop the tower, and retract the hydraulic outriggers.


9. Turn the handles of the drilling rig mud pump, transfer case and other components to the neutral position. Switch the chassis gear to separate the top gear, pull the rear drive gear, and exit the drilling station.


Related News
Read More >>
Road Leveling Bulldozer: The Core Guarantee for Efficient Road ConstructionRoad Leveling Bulldozer: The Core Guarantee for Efficient Road Construction
Aug 04, 2025
The quality and efficiency of road construction largely depend on the road leveling process. And the road leveling bulldozer ​is the core equipment to ensure the efficient development of road leveling work. No matter what scale of road pro ...
Off-Road Forklifts_ A Powerful Assistant for Complex Field OperationsOff-Road Forklifts_ A Powerful Assistant for Complex Field Operations
Aug 02, 2025
In various field operations, off-road forklifts are indispensable equipment. Scenarios such as mining, forest logging, and field infrastructure construction all rely on the efficient material handling support of off-road forklifts. ...
High-Load Off-Road Forklift: A Powerful Tool for Heavy-Duty Operations in Complex EnvironmentsHigh-Load Off-Road Forklift: A Powerful Tool for Heavy-Duty Operations in Complex Environments
Aug 01, 2025
In non-paved scenarios such as construction sites, mines, and field logistics, the high-load off-road forklift is a core equipment for improving efficiency. Compared with ordinary forklifts, the high-load off-road forklift can not only handl ...
All products are guaranteed for 12 months!